Tips that work!  
Tips For Six Sigma   Green Belt    Project Teams*
(*TEAM 2000 Guided Initiatives)

 

Rai Chowdhary
MS, Six Sigma Master Black Belt, Cert: CQE, CQM, Lean
 

 

Copyright TEAM 2000, All Rights Reserved    Last Update  Aug 2005

Phase of Project Key activities that need to occur (Sample...) Useful tools / skills during this stage (Use what is needed) End of Phase check

 Pre-DMAICA 

Check to determine if this
  type of a problem has been
  solved before, or a similar
  project has been executed
  before
Company database / reports Decision to proceed with this
  project, or use known
  solutions from a
  previously completed
  project. (This can save time,
  and resources for the
  company, and re-direct your
  focus on more meaningful
  projects)

 Define 

Work on project charter and
  problem statement

Get buy in from Sponsors /
  Champions

Establish tie in with Finance

Identify all parties that will be
  affected by change the
  project will drive

Understand the process in the
  "as is" condition, the
  expectations of Sponsors,
  and Champions

SIPOC

Process Mapping

Pareto Chart

Prioritization Matrices

Causal Event Maps

Project Management

Voice of the Customer

Team Building

Financial Statements Analysis

Operating Definitions

Problem Statement is defined
Charter is created and buy
   in obtained
Project Plan is created
Understanding of financial
   impact
Finance focal is on board
  with the team
Parties that will be affected
  by the upcoming changes
  are identified, and
  communication channels
  opened with them
First cut on what data to
  collect

 Measure 

Determine what you will
  measure, x, y, X, Y

Identify the nature of the
  variables

Test your Measurement
  System for Accuracy,
  Precision, Stability, etc.

Locate the variables on the
  Process Map

Collect data, and,
  create a baseline to
  document existing
  performance levels

Identify gap

Re-visit Problem Statement
  and Charter to do a reality
  check

SIPOC

Process Mapping

Measurement Systems Analysis

Voice of the Customer

Run Charts

Statistical Process Control Charts

Process Capability

Operating Definitions

Touch Time / Cycle Time Calculations

 

Process Map is created
Team understands the inputs
  and outputs for the process,
  at each step, the control
  and check points in the
  process are identified as
  they exist today
The Key Process Variables
  are identified
Data collection methodology
   with regard to these
   variables is in place
Measurement system error is
  quantified, and ways to
  deal with the same are put
  in place
Gap between current state
  and future state is visible
Finance linkage is clear
Data is collected for further
  analysis
Confirmed Problem
  Statement, and Charter

 Analyze 

Study the gap

Identify potential causes for
  the same

Narrow down causes that
  responsible for the gap

Begin identifying what needs
  to change

Communicate gap, and
  causes for the gap to
  Sponsors, Champions,
  Process Owners,
  and other departments as
  needed

SIPOC

Process Mapping

Causal Event Maps

Cause and Effect Analysis

Affinity Diagrams

Value Added / Non-Value Added Analysis

Pareto Charts

Histograms

Scatter Plots

Statistical Analysis Methods

Statistical Process Control Charts

People Styles

Creative Problem Solving Techniques

Team understands the inputs
  and outputs for the process,
  at each step, the control
  and check points in the
  process are identified as
  they exist today
The relationship between
  Key Process Variables
  is understood
Important variables are
  determined and a plan laid
  out on how to manage these
Gap between current state
  and future state is visible,
  key individuals and
  departments who will be
  affected by upcoming
  changes are notified
Finance linkage is clear
Relevant data is collected for
  further analysis
What needs to change is
  beginning to surface
Process owners, Sponsors,
  and Champions are abreast
  of upcoming changes, and
  are willing to make the
  necessary commits

 Improve, and 
 Implement 

Define what needs to change
  in the processes that are
  being analyzed

Identify changes /
  improvements that will
  produce the desired results

Build buy-in with Process
  Owners for the upcoming
  changes

Create plan to drive changes,
  and improvements

Execute and make the
  necessary changes for
  improvements

Cause and Effect Diagrams

Process Mapping

Causal Event Maps

Pareto Charts

Prioritization Matrices

Force-Field Analysis

Failure Modes and Effects
Analysis

Scatter Plots

Statistical Analysis Methods

People Styles

Project Management

Cost Benefit Analysis

Touch Time / Cycle Time Analysis

Value Added / Non-Value Added Analysis

Creative Problem Solving Techniques

Force Field Analysis

Changes required to improve
  the processes have been
  identified and deployed -
  including training of
  employees, equipment 
  changes / acquisitions, 
  and modifications to work
  flow
Process Map is updated with
  changes
Cost benefit analysis
  conducted to determine
  which of the improvements
  are in the best interest of the
  company (Finance has
  provided their input)
Purchase of capital
  equipment, or additional
  other resources has been
  completed and these are
  in place now
First round of what can go
  wrong is in works
People / departments affected
  by change have bought into
  the change and agreed to
  accept the change
Respective teams / individuals
  / departments are ready to
  begin collecting data in the
  "After Change" condition
Finance is ready to start their
  tracking to capture benefits

 Control 

Document the changes, and
  embed these into the
  company's Quality
  Management System

Conduct what if analysis to
  identify what can go wrong
  and causes for such failures

Put the necessary procedures
  and policies in place to
  ensure the changes cannot
  be un-done

Install indicators at the right
  locations in the process
  to act as early warning
  mechanisms if the process
  begins to change / drift

Build in control mechanisms
  to ensure process stays
  within designated limits  

Cause and Effect Diagrams

Process Mapping

Causal Event Maps

Force-Field Analysis

Failure Modes and Effects
Analysis

Statistical Analysis Methods

People Styles

Project Management

Risk Management

Cost Benefit Analysis

Statistical Process Control Charts

Financial Statements Analysis

Force Field Analysis

Operational Definitions

Completed Risk Analysis
  with potential causes for
  failures identified.
Corrective / preventive actions
  in place
Processes operating within
  expected boundaries,
  (Stable and Capable) as
  evidenced by the
  performance of Key Process
  (Input and Output) Variables
Process owners have
  accepted the changes
  made to their work areas
Quality Management System
  updated, procedures and
  policies have been signed
  off
Employees have been
  trained to work with the
  improvements
Employee certification plan
  in place to ensure their 
  performance does not 
  deteriorate
Required equipment has been
  installed / modified, and 
  verified for performance. 
  Maintenance plan is in
  place
Sponsors and Champions
  are tracking results from
  the changes
Finance is tracking the
  respective metrics and
  department budgets are
  re-set to reflect changes

 Anchor 

Project report is written, and
 documents lessons learned

Database for Six Sigma
  Projects is updated, and
  relevant project info is
  uploaded to the company
  intranet

Merit review of employee
  captures their performance
  on the project

Technical / Report writing

Web-tools

Databases

Report is readable with
  minimal chance of
  misinterpretation, and
  signed off by Team Lead,
  Sponsors, Champions, and
  Implementation Team focal
Report is easily located when
  a search is conducted on
  the company's intranet
Lessons learned on what
  improvements work for what
  kinds of problems are
  transferable within the
  company
HR Database is updated to
  include the skill sets gained
  by each of the team
  members
Merit review is completed

Copyright TEAM 2000, All Rights Reserved    Last Update  Aug 2005